IEC QUALITY ASSESSMENT SYSTEM (IECQ)
For rules and details of the IECQ visit www.iecq.org |
IECQ Certificate of Conformity
Specialised Process
|
IECQ Certificate No.: | IECQ-P BSI 15.0004 | Issue No.: | 4 | Status: | Superseded |
|
Supersedes: | IECQ-P BSI 15.0004 Issue 3 | Issue Date: | 2020/12/08 | Org. Issue: | 1997/04/17 |
CB Reference No.: | E003/PA Issue 8 | Expiration: | 2024/02/01 | | |
|
F C Lane Electronics Ltd
Slinfold Lodge, Stane Street
Slinfold, Horsham
RH13 0RN
United Kingdom
|
The organization has developed and implemented procedures and related processes that have been assessed by the IECQ Certification Body in accordance with IECQ 03-1 and IECQ 03-2 for issuance of this certificate and found to be in conformity with the applicable requirements of the IECQ Approved Process Scheme and in respect of standard(s) or specification(s):
|
|
- CECC 200 024 (Iss. 1, April 1997) – Process Assessment Schedule for Final Assembly of Electrical Connectors
|
Process Manual Reference: | CECC PAM 002 Issue 4: IF186 Issue I | |
|
|
|
Scope of Activity: | | | |
Final assembly of electrical connectors |
Issued by the Certification Body: BSI |
Kitemark Court, Davy Avenue Knowlhill, Milton Keynes MK5 8PP
United Kingdom
Authorised Person: Paul Turner
| | |
|
The validity of this certificate is maintained through on-going surveillance audits by the IECQ CB issuing this certificate. This Certificate of Conformity may be suspended or withdrawn in accordance with the
Rules of Procedure of the IECQ System and its Schemes.
This certificate and any schedule(s) may only be reproduced in full.
This certificate is not transferable and remains the property of the issuing IECQ CB.
The Status and authenticity of this certificate may be verified by visiting www.iecq.org.
| |
|
IECQ-P Rev. 07 EN
- Attached Translation: none [ Add ] |